Tag: taipa ferry terminal

The long-awaited Taipa Ferry Terminal

Taipa’s new maritime terminal, which has been under construction since 2005 was inaugurated on the 18th May 2017. It cost MOP 3.8 billion (US$475 million).
With an annual capacity of 30 million passengers, the terminal has an area of 200,000 square metres (20 hectares) with 16 ferry berths, 3 berths for multi-purpose use, a heliport with capacity for 5 helicopters, 88 immigration desks and a car park for 740 vehicles.

18 May, 2017